Inactive
Notice ID:12363N23Q4030
Amendment 001: Period of performance: 30 May 2023 to 15 November 2023 Posted Signed SF-30 (01/11/2023). Contractor does not need to sign and return with quote. Elk Tooth 1 Marking and Cruising Contrac...
Amendment 001: Period of performance: 30 May 2023 to 15 November 2023 Posted Signed SF-30 (01/11/2023). Contractor does not need to sign and return with quote. Elk Tooth 1 Marking and Cruising Contract Marking and cruising of 177 Acres in northern hardwoods timber on the Park Falls Ranger District. Work is in 3 items. Contractors are required to be Forest Service certified, or have in their employ a certified person, before bidding on a contract that includes volume determination. Certification from the Chequamegon-Nicolet or the Ottawa National Forests will be accepted. Proof of certification will be required. The Contractor shall furnish all labor, materials, equipment, tools, instruments, supplies, transportation, professional services and supervision, except that which is designated as Government-furnished property.