Retention Pond Vegetation Removal
This project involves removing vegetation from a retention pond at the USDA, ARS location in Gainesville, FL. The work includes clearing all vegetation in the pond, removing specified trees and stumps, and either hauling debris off-site or mulching it on-site. A tracked excavator is necessary, and equipment can be left on-site during performance. The required completion timeframe is 4 weeks from the start of work. No budget information was provided.