Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:1205M620Q0058
This work is for moving a Cascadian single vault CXT toilet approximately 2 miles. This work consists of the following: Provide all the equipment and labor necessary to move a single vault CXT from Be...
This work is for moving a Cascadian single vault CXT toilet approximately 2 miles. This work consists of the following: Provide all the equipment and labor necessary to move a single vault CXT from Beth Lake Campground approximately 2 miles south to Beaver Lake Campground. At Beaver Lake Campground the new location of the single vault CXT will be excavated and compacted per the specifications following CXT design and excavated by the Forest Service. The intent of the contract is to provide for the complete construction of the project describe in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the projects in accordance with drawings, specifications, and provisions of the contract. The Contractor is responsible for visiting the job site, and determining all materials and quantities needed prior to submitting a quote. All other work and materials will be considered as incidental to and included in the payment for items shown The CXT single Vault Toilet is located at Beth Lake Campground and will be moved approximately 2 miles south to Beaver Lake Campground. Contractor has 30 days to complete work after Notice to Proceed is issued. It is anticipated that the start date will be after July 1st, 2020. The Government's estimate is: less than $25,000 Technical Point of Contact is Betsy Paterson at 509-486-5111 POC Jorge Somoza, Contract Specialist, Phone (425) 783-6053. Email jorge.somoza@usda.gov