Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:12046W19R0006
Work will include: Removal and replacement of two trail bridges on Trail #440; Fern Ck #440 MP 2.6 and High #440 MP 3.3. Fern Creek consists of removal of a fire damaged existing 40' span steel truss ...
Work will include: Removal and replacement of two trail bridges on Trail #440; Fern Ck #440 MP 2.6 and High #440 MP 3.3. Fern Creek consists of removal of a fire damaged existing 40' span steel truss trail bridge superstructure and disposal; supply and installation of 3' x 45' prefabricated steel truss trail bridge; supply and installation of two concrete grade beam abutments; minor trail bridge approach excavation and embankment construction. High Trail consists of removal of a fire damaged existing 45' span steel truss trail bridge superstructure and disposal; supply and installation of 3' x 50' prefabricated steel truss trail bridge; supply and installation of one concrete grade beam abutment; construction of cast-in-place concrete abutment; and minor trail bridge approach excavation and embankment construction. The solicitation for this project will be posted on or around 05/13/2019.