This project consists of two parts, the first of which is the statement of work and hardware list for network switch installation, cable management, and switch configuration. The items on the hardware...
This project consists of two parts, the first of which is the statement of work and hardware list for network switch installation, cable management, and switch configuration. The items on the hardware list on page 15 is to be provided by the vendor. The second part of the project is a statement of work for the Cisco ISE portion of the installation. The work is to be performed at the U.S. Court of International Trade, located at 1 Federal Plaza, New York, N.Y., 10278.