Inactive
Notice ID:20-SP5-138
Excerpt taken from Statement of Work (SOW) attached; 1.1 SCOPE: The work consists of, but is not limited to, the construction of integrated audio, video, and control systems. The work will be conducte...
Excerpt taken from Statement of Work (SOW) attached; 1.1 SCOPE: The work consists of, but is not limited to, the construction of integrated audio, video, and control systems. The work will be conducted to provide the least possible interference to the activities of the Owner's personnel and operations. The Contractor shall provide equipment that, where required, shall conform to the applicable requirements of the Underwriter’s Laboratories, Inc., local codes, the National Electrical Code and any other governing codes. Such items will bear or mark indicating their conformance to the above requirements. The Contractor shall provide a system configured and installed for simplicity of operation and low maintenance, with user-friendly controls. All control system programming requirements should be verified with the court prior to initiation of the installation process. The final submission MUST include a completed copy of Schedule B (Provided as an attachment) All specifications for the work and equipment are listed in the attached Audio & Video Systems Final Design Report. Award of this task order will be made to the company whose technically acceptable proposal offers the lowest price to the court