Inactive
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice ID:W9128F22Q0022
Tank Inspection: The tank inspection shall be in conformance with applicable industry standards API 653, API 650, NFPA 30, NFPA 326, UFGS 33 01 50.65, and in compliance with 40 CFR 112, UFC 3-460-01, ...
Tank Inspection: The tank inspection shall be in conformance with applicable industry standards API 653, API 650, NFPA 30, NFPA 326, UFGS 33 01 50.65, and in compliance with 40 CFR 112, UFC 3-460-01, UFC 3-460-03 and any other applicable federal, state, local, service or host nation requirements. Perform an External AST inspection to also include the visual inspection of the containment area. The contractor shall visually inspect containment for ability to contain the entire contents of the tank in the event of catastrophic failure, assessing for cracks, settlement, and deterioration. Record dimensions of cracks and provide photographic evidence of each deficiency. Provide DRAFT and FINAL inspection reports per the attached templates. The report(s) must include a record of NDE findings with drawings depicting plate layout and thickness measurement locations. Incorporate engineering analysis, suitability for service analysis pursuant to paragraph SUITABILITY FOR SERVICE, corrosion rate determinations, and remaining service life calculations. Provide separate report for each tank inspected. Specify the due date for the next inspection. SUTABILITY FOR SERVICE: Evaluate inspection data to determine suitability for continued use. Identify conditions which pose a risk to integrity. Determine a metal loss threshold for mandatory repairs. In the determination of mandatory repairs: a. Use a "first, do no harm" approach to classifying tank repairs. b. Use Desired Service Interval as the time to next inspection unless notified otherwise by the Contracting Officer. c. Use minimum remaining thickness (MRT) no less than 100 mils at the next inspection. d. Do not classify as mandatory repair of conditions which are noncompliant with current standards but are un-related to structural or hydraulic integrity (e.g., gouge, improper weld spacing, weld profile). e. Apply repair determination to individual indications. Do not average across an entire plate or course. 1/20/2022 - Additional documents have been added to the attachment section of this solicitation. FINAL-API Post Repair-COL-FAC 143-FY19 Columbus-Fac 143 (Tank 6)-FINAL-2017 1 FEB 2022 - Updated Attachment B - A roundness survey is not required for this requirement.