Inactive
Notice ID:N69450-25-0491
The scope of the requirement is to provide inspection of the cross-bay waterline to determine the extent of damage preventing water flow, provide an engineering-based repair method appropriate for the...
The scope of the requirement is to provide inspection of the cross-bay waterline to determine the extent of damage preventing water flow, provide an engineering-based repair method appropriate for the existing line and execute immediate repairs if feasible.