Inactive
Notice ID:N61331-22-T-NS10
AMENDMENT #3 REMOVE SET-ASIDE AND EXTEND THE CLOSING DATE TO 9/2/2022 AMENDMENT #2 CHANGES DRAWINGS FROM PUBLIC TO CONTROLLED AMENDMENT #1 TO EXTEND THE CLOSING DATE TO 8/29/22 and correct PSC & NAICS...
AMENDMENT #3 REMOVE SET-ASIDE AND EXTEND THE CLOSING DATE TO 9/2/2022 AMENDMENT #2 CHANGES DRAWINGS FROM PUBLIC TO CONTROLLED AMENDMENT #1 TO EXTEND THE CLOSING DATE TO 8/29/22 and correct PSC & NAICS Email quotes to adrienne.f.brooks.civ@us.navy.mil on or before the closing date and time of Friday 2 September 2022 4pm Central Time. The Government will not accept late quotes. Provide CAGE code and Lead time on your quote. Be able to invoice through Wide Area Workflow (WAWF). If shipping is not included in the price, please include a line item for shipping. The Government intends to award a firm fixed price purchase order using simplified acquisition procedures. Destination: Naval Base Kitsap-Keyport, Washington. Please review all attachments. A description of the supplies or services required to meet the agency’s needs. Scope: This proposed contract is for procurement of Deployment Retainer NAVSEA Drawing 2820911 Rev F Assembly Level Baseline with Drawing Reference, Sequential, and all associated drawings, changes, and specifications. The award shall be for a base year with one option year. Requirements: CLIN 0001 – Deployment Retainer First Article (Qty. 2) The contractor shall build Deployment Retainer in accordance with NAVSEA Drawing 2820911 Rev F, Baseline with Drawing Reference - Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU - End user inspection and acceptance. CLIN 0002 – Deployment Retainer Production (Qty. 700) The contractor shall build Deployment Retainer in accordance with NAVSEA Drawing 2820911 Rev F, Baseline with Drawing Reference - Sequential, and all associated drawings, changes, and specifications. Inspection and Acceptance to be performed at NUWC Keyport by Code 522. The government will need 45 days for IU - End user inspection and acceptance. CLIN 0003 – Deployment Retainer - Option 1 (Qty. 700)