The replacement of two air cooled chillers with high efficiency equipment, pumps, valves, actuators and piping. Remove existing water cooled chillers. Remove chilled water pumps; water valves, actuators; DDC control systems; water supply and return pipin
FA3016-20-B-0011
The replacement of two air cooled chillers with high efficiency equipment, pumps, valves, actuators and piping. Remove existing water cooled chillers. Remove chilled water pumps; water valves, actuato...