Inactive
Total Small Business Set-Aside (FAR 19.5)
Notice ID:832369495
As appicable, send material technical data sheets, TDS, and MSDS information as a separate attachment. -------------------------------------------------------------------------------------------------...
As appicable, send material technical data sheets, TDS, and MSDS information as a separate attachment. ------------------------------------------------------------------------------------------------------------------- 1. Added Attachment 6 AMD01 - Combined Appendix A-C. AMD01 changed piping material. 2. Added "Combined Appendix A-C AMD01" reference to Attachment 1 - SOW 832369495. 3. Removed Attachment 6 - Combined Appendix A-C. ------------------------------------------------------------------------------------------------------------------- Amendment 2 performs the following actions: 1. Proposal due date extended to April 25, 2024, at 2:00 PM (CST). 2. Attachment 5, Site Visit Request Instructions 832369495, deleted from solicitation. ------------------------------------------------------------------------------------------------------------------- Added attachment "Site Visit Sign In Sheet". Added RFI Questions and Answers attachment. ------------------------------------------------------------------------------------------------------------------- Amendment 1 performs the following actions: 1. Proposal due date extended to April 5, 2024, at 2:00 PM (CST). 2. Attachment 5, Site Visit Request Instructions 832369495, revised with date and meeting times. -------------------------------------------------------------------------------------------------------------------- You must submit a Document Access request. The Access Request Link is located below the Attachments/Links header. You must be logged in and a registered user within your organization. Provide Data Center Mechanicsburg with a new condenser water filtration system and dual path piping for redundancy. Install a new condenser water filtration system associated piping that will remove suspended particles from the cooling tower water thus helping maintain design efficiencies and extending the life of data center equipment including the cooling towers, heat exchangers, and chillers. Questions should be addressed to john.m.ross138.civ@mail.mil. Please provide any questions, in writing, no later than March 27, 2024, at 2:00pm (CST). The Government reserves the right to not answer questions submitted after this time.