RFQ # 12905B22Q0014 Installation consists of digging a 4 to 6’ deep trench, installing PVC pipes and fitting such that water can be delivered from the canal to the 5 drywells (DW1/2/3/4/5) Terranova Ranch - 16729 W Floral Avenue, Helm, CA 93627
12905B22Q0014
The USDA ARS requires that all labor, supervision, tools, and materials be provided to Installation consists of digging a 4 to 6’ deep trench, installing PVC pipes and fitting such that water can be d...